Construction Portable Toilet Rental in Arlington
Our construction toilet rental delivery service area covers Arlington with a fixed weekly route. We secure each unit with ground-stake anchors to prevent movement during a mid-pour and provide a single porta potty for the site. We bill monthly to avoid mid-build invoice surprises.

Built around the regulation:
OSHA Worker Ratios for Unit Quantity Planning
1 per 20 Workers
One toilet per twenty workers is standard for crews of twenty or fewer.
Female-Worker Add
Separate stalls once crews include workers of more than one gender.
Urinal Substitution
One urinal counts as one fixture toward one-third of total count.
Large-Crew Step
Crews of 200 or more workers operate one fixture per 40 workers per shift.

Weekly Servicing Schedules on Active Job Sites
Rough-Site Logistics with Crane-Liftable Units
High-rise builds in Arlington need jobsite units that cycle between floors without breaking the seal. Our crane-liftable restrooms feature a reinforced steel cage with rigging eyes for tower-crane lifts; the skid-mounted base rolls onto the hoist deck via rugged casters. On grade, anchor to gravel or bolt to concrete. The waste tank drains through a holding tank into the vacuum truck’s suction hose per the OSHA 1910.141 sanitation rule for construction worker restrooms. Relocate between phases with monthly construction portable toilet rental pricing across Arlington.
Construction Site Questions
-
+ How many units do I need for a thirty-worker crew?
Two standard units provide enough waste tank capacity for thirty workers under OSHA 1926.51(c), while adding an ADA stall ensures compliance on public-funded job sites.
-
+ Can the service day be locked to a specific weekday?
Monthly contracts secure a fixed weekday and route window maintained for the entire duration of your building project.
-
+ What does monthly billing include?
Delivery, weekly servicing, paper and sanitizer top-ups, and final pickup, plus phase relocations on long-term contracts.
-
+ Do you deliver to active concrete pours?
Concrete pours need the drop scheduled ahead of the forms, stage on gravel clear of the pour area, then reposition once the pad cures.

Lock In Your Jobsite Service Today
Tell dispatch your jobsite address, peak headcount, and project duration by mobilization day to confirm your unit count and rate — call (571) 474-2253.